Miami · South Florida · Nationwide

Fire Protection
Engineering That Gets Built

Full-service fire protection design, inspection, and permitting. NFPA 13, 14, 20 & 25. From luxury high-rises to affordable housing.

View Our WorkGet a Quote
759,722
Sprinkler Heads Designed
110+
Projects Completed
28+
Cities Served
10 yrs
In Business

Notable Projects

View all 110 projects →
1 Southside Park
Multi-Family Residential

1 Southside Park

Miami, FL

39-story luxury residential tower in Miami's Brickell neighborhood — 449 units developed by Related Group. The tallest tower at Southside Park, with full resort amenity program, bayfront access, and panoramic views of Biscayne Bay and the Miami skyline.

~39,091 headsCompleted
Miami Waldorf Astoria
Ultra-Luxury High-Rise

Miami Waldorf Astoria

Miami, FL

100-story supertall skyscraper at 300 Biscayne Blvd — 1,049 ft, Miami's tallest building and first supertall. Mixed-use tower with 360 residences (floors 40–100) and 205-key Waldorf Astoria hotel (floors 1–39), designed as nine staggered glass cubes by Carlos Ott / Sieger Suarez. Developed by PMG.

~31,819 headsCompleted
Bentley Residences - Sunny Isles Beach
Ultra-Luxury High-Rise

Bentley Residences - Sunny Isles Beach

Sunny Isles Beach, FL

63-story luxury oceanfront tower in Sunny Isles Beach — 749 ft, 216 branded residences, tallest beachfront residential tower in the US. Each unit features a private 4-car sky garage via the Dezervator™ car elevator system, private pool terrace, and ocean views. By Dezer Development / Sieger Suarez Architects.

~27,273 headsCompleted
Aston Martin Residences
Ultra-Luxury High-Rise

Aston Martin Residences

Miami, FL

66-story supertall luxury condo in Downtown Miami — 816 ft, 391 residences, designed by Revuelta Architecture. Branded by Aston Martin with a full-height glass curtainwall and amenity program including a superyacht marina, sky amenity floor, spa, and two-story penthouse sky villas.

~24,788 headsCompleted
1401 Brickell - Santander
Multi-Family Residential

1401 Brickell - Santander

Miami, FL

Mixed-use residential development with NFPA 13 coverage across all occupied floors, covering all residential floors, parking structure, amenity deck, and ground-floor retail where applicable.

~24,091 headsCompleted
Jem - MWC Block A - Naftali - Miami
Multi-Family Residential

Jem - MWC Block A - Naftali - Miami

Miami, FL

54-story ultra-luxury residential tower within Miami World Center, Block A — 259 residences developed by Naftali Group. JEM Private Residences features full-floor and half-floor luxury units, a curated art program, and a world-class amenity collection within one of Miami's most ambitious urban mixed-use developments.

~22,723 headsCompleted

What We Do

📐

System Design

NFPA 13 wet, dry, and pre-action sprinkler systems. Hydraulic calculations included.

🏗️

Standpipe & Hose

NFPA 14 Class I, II, and III standpipe systems for mid-rise and high-rise buildings.

💧

Fire Pumps

NFPA 20 fire pump sizing, churn pressure analysis, and pump room layout.

🔍

ITM & Inspection

NFPA 25 inspection, testing, and maintenance programs. Deficiency reports included.

Latest on the Blog

All articles →
Engineering Insight

Fire Pump Sizing for High-Rise Buildings: The NFPA 20 Logic That Gets Missed

In high-rise residential and mixed-use towers, the fire pump is the single most consequential piece of infrastructure in the fire protection system. Size it wrong and the standpipe cannot meet pressure at the top floor. Miss the churn pressure calculation and you have over-pressurized fittings. Get the power coordination wrong and the pump room fails its acceptance test before occupancy.

March 14, 20265 min read
Inspection & ITM

The Silent Failure: Corrosion Inside Dry Pipe and Pre-Action Systems

A dry pipe system spends most of its life pressurized with air, not water. That combination — oxygen, residual moisture, and bare steel — creates the conditions for corrosion that nobody sees until a pipe fails, a head clogs, or a five-year internal inspection uncovers tuberculation so severe the system cannot deliver its rated flow.

March 11, 20265 min read
Code Update

What NFPA 13:2025 Actually Changes — and What You Need to Do Now

Every code cycle, most changes are incremental. The 2025 edition of NFPA 13 is not. Three separate task groups overhauled how the standard handles dry pipe systems, high-clearance spaces, and sloped ceiling storage — and if you are designing or reviewing systems in Florida today, some of those changes are already in play.

March 8, 20265 min read

Ready to start your project?

We design permit-ready fire protection systems.

Get in Touch